Please refer to document “1.4 – Guide to the Application” for a list of all files, descriptions, version numbers, and submission dates
Part 1 – Application Form
Part 2 – Plans, Drawings and Sections
Part 3 – Development Consent Order
Part 4 – Compulsory Acquisition Information
Part 5 – Reports and Statements
5.1 Consultation Report Appendices Appendices A1 to A2 (Compliance statement)
5.1 Consultation Report Appendices Appendices B1 to B2 (List of consultees)
5.1 Consultation Report Appendix B3 (S44 list redacted version)
5.1 Consultation Report Appendices Appendices C1 to D3 (SoCC)
5.1 Consultation Report Appendices Appendices E1 to E4 (S42 supporting documents)
5.1 Consultation Report Appendices Appendices F1 to F3 (Stage 1 supporting documents)
5.1 Consultation Report Appendices Appendices G1 to G3 (Stage 2 supporting documents)
5.1 Consultation Report Appendices Appendices H1 to H2 (Section 48 supporting documents)
5.1 Consultation Report Appendices Appendices I1 to I6 (Reports)
5.1 Consultation Report Appendices Appendices I7 (Stage 1 Consultation report)
5.1 Consultation Report Appendices Appendices I8 (Stage 2 Consultation report)
5.1 Consultation Report Appendices Appendices J1 to J2 (EIA supporting documents)
5.1 Consultation Report Appendices Appendices K1 to K2 (Other supporting documents)
5.2 Environmental Protection Statement of Engagement
5.3 Consents and Licences required under Other Legislation – superseded by 9.71 ExA.FI.D7.V1
5.6 Flood Risk Assessment Appendix App B EA data part 1 (Part 2 of 17)
5.6 Flood Risk Assessment Appendix App B EA data part 2 (Part 3 of 17)
5.6 Flood Risk Assessment Appendix App C to J (Part 4 of 17)
5.6 Flood Risk Assessment Appendix App K to M (Part 5 of 17)
5.6 Flood Risk Assessment Appendix App N part 1 (Part 6 of 17)
5.6 Flood Risk Assessment Appendix App N part 2 Tidal flood maps 2015 (Part 7 of 17)
5.6 Flood Risk Assessment Appendix App N part 3 Tidal flood maps 2075 (Part 8 of 17)
5.6 Flood Risk Assessment Appendix App N part 4 Tidal flood maps 2115 (Part 9 of 17)
5.6 Flood Risk Assessment Appendix App N part 5 Fluvial flood maps 2015 (Part 10 of 17)
5.6 Flood Risk Assessment Appendix App N part 6 Fluvial flood maps 2075 (Part 11 of 17)
5.6 Flood Risk Assessment Appendix App N part 7 Fluvial flood maps 2115 (Part 12 of 17)
5.6 Flood Risk Assessment Appendix App N part 8 Flood difference maps (Part 13 of 17)
5.6 Flood Risk Assessment Appendix App O part 1 (Part 14 of 17)
5.6 Flood Risk Assessment Appendix App O part 2 (Part 15 of 17)
5.6 Flood Risk Assessment Appendix App O part 3 (Part 16 of 17)
5.6 Flood Risk Assessment Appendix App P to T (Part 17 of 17)
Part 6 – Environmental Impact Assessment
6.2 ES Volume 1 Non-Technical Summary (Version 2) clean
6.4 ES Chapter 1 Introduction (Version 2) clean
6.5 ES Chapter 2 Description of the Study Area
6.6 ES Chapter 3 Scheme Development and Alternative Considered (Version 2) clean
6.7 ES Chapter 4 Description of the Proposed Works (Version 2) clean
6.8 ES Chapter 5 Approach to the Environmental Statement
6.9 ES Chapter 6 Planning Framework
6.10 ES Chapter 7 Air Quality and Greenhouse Gases (Version 3) clean
6.11 ES Chapter 8 Cultural Heritage (Version 2) clean
6.12 ES Chapter 9 Ecology and Biodiversity (Version 3) clean
6.13 ES Chapter 10 Geology, Hydrogeology, Ground Conditions and Contaminated Land
6.14 ES Chapter 11 Landscape and Visual Impacts Assessment
6.15 ES Chapter 12 Materials and Waste (Version 2) clean
6.16 ES Chapter 13 Noise and Vibration (Version 2) clean
6.17 ES Chapter 14 Socio-economics and Economic Regeneration
6.18 ES Chapter 15 Soils, Agriculture, Land Use and Assets (Version 2) clean
6.19 ES Chapter 16 Transport, Access and Non-Motorised Users (Version 2) clean
6.20 ES Chapter 17 Water Resources, Drainage and Flood Risk Water Resources (Version 2) clean
6.21 ES Chapter 18 In-combination and Cumulative Effects Assessment
(6.22 Number not used)
6.24 ES Volume 3 Figure 1.3 Location Plan
6.24 ES Volume 3 Figure 6.1 Planning Constraints (Version 2) clean
6.24 ES Volume 3 Figure 7.1, 7.2, 7.3 and 7.4 Air Quality_(Version 2)
6.24 ES Volume 3 Figure 8.1 Cultural Heritage (Version 2) clean
6.24 ES Volume 3 Figure 8.2 Cultural Heritage (Figure 8.1 Version 1 included; see Version 2 above instead)
6.24 ES Volume 3 Figures 9.1 to 9.4 Ecology and Biodiversity (Version 2) clean
6.24 ES Volume 3 Figure 10.1 Ground Conditions (Version 2) clean
6.24 ES Volume 3 Figures 11.1 to 11.3 Landscape and Visual Impacts Assessment (Version 3) clean
6.24 ES Volume 3 Figure 17.1 Water Features (Version 2) clean
6.24 ES Volume 3 Figure 18.1 Proposed Development (Version 2) clean
6.25 ES Volume 4 Appendix 1.1 to 1.3 Introduction (Version 2) clean
6.25 ES Volume 4 Appendix 4.1 Code of Construction Practice (Version 2) clean
6.25 ES Volume 4 Appendix 4.2 Master Construction Environmental Management Plan (Version 4)
6.25 ES Volume 4 Appendix 5.1 to 5.2 Approach to the Environmental Statement
6.25 ES Volume 4 Appendix 7.1 to 7.5 Air Quality and Greenhouse Gases (Version 3) clean
6.25 ES Volume 4 Appendix 8.1 to 8.2 Cultural Heritage
6.25 ES Volume 4 Appendix 9.1 Phase 1 Survey Part 1
6.25 ES Volume 4 Appendix 9.1 Extended Phase 1 Habitat Survey (Part 2 – Figures) (Version 2) clean
6.25 ES Volume 4 Appendix 9.2_Technical Bat Appendix (Version 2)
6.25 ES Volume 4 Appendix 9.3a and 9.3b Bird Surveys
6.25 ES Volume 4 Appendix 9.3c Ornithology Survey Report WCA Schedule 1 CONFIDENTIAL (Version 2) clean (available only to those who require it)
6.25 ES Volume 4 Appendix 9.4 and 9.5_GCNs and Reptiles (Version 2)
6.25 ES Volume 4 Appendix 9.6 Badger Survey Report CONFIDENTIAL (Version 2) – clean (available only to those who require it)
6.25 ES Volume 4 Appendix 9.7 Dormouse, 9.8 Otter and 9.9 Water Vole Surveys
6.25 ES Volume 4 Appendix 9.10 Flora Report
6.25 ES Volume 4 Appendix 9.11 Avon Gorge Vegetation Management Plan (Version 3) clean
6.25 ES Volume 4 Appendix 9.12 Report to Inform Habitats Regulations Assessment (Version 3) clean
6.25 ES Volume 4 Appendix 9.13 to 9.18 Ecology and Biodiversity (Version 4) (clean)
6.25 ES Volume 4 Appendix 10.1 Risk Classification
6.25 ES Volume 4 Appendix 10.2 Land Contamination Annex A1
6.25 ES Volume 4 Appendix 10.2 Land Contamination Annex A2
6.25 ES Volume 4 Appendix 10.2 Land Contamination Annex A3
6.25 ES Volume 4 Appendix 10.2 Land Contamination Annex A4
6.25 ES Volume 4 Appendix 10.2 Land Contamination Annex A5
6.25 ES Volume 4 Appendix 10.2 Land Contamination Annexes B to J
6.25 ES Volume 4 Appendix 11.1 to 11.2 Landscape and Visual Impacts Assessment General Views
6.25 ES Volume 4 Appendix 11.3 and 11.4 Landscape and Visual Impacts Assessment (Version 2) clean
6.25 ES Volume 4 Appendix 13.1 to 13.9 Noise and Vibration
6.25 ES Volume 4 Appendix 14.1 to 14.2 Socio-economics
6.25 ES Volume 4 Appendix 16.1 Transport Assessment (Version 2) clean
6.25 ES Volume 4 Appendix 16.1 Transport Assessment_Pt 1 Main Report (Part 1 of 18)
6.25 ES Volume 4 Appendix 16.1 Transport Assessment_Pt 2 FIGURES 1 (Part 2 of 18) (Version 2) clean
6.25 ES Volume 4 Appendix 16.1 Transport Assessment_Pt 3 FIGURES 2 (Part 3 of 18)
6.25 ES Volume 4 Appendix 16.1 Transport Assessment_Pt 4 FIGURES 3 (Part 4 of 18)
6.25 ES Volume 4 Appendix 16.1 Transport Assessment_Pt 5_Appendix A (Part 5 of 18)
6.25 ES Volume 4 Appendix 16.1 Transport Assessment_Pt 6_Appendix B (Part 6 of 18)
6.25 ES Volume 4 Appendix 16.1 Transport Assessment_Pt 7_Appendix C (Part 7 of 18)
6.25 ES Volume 4 Appendix 16.1 Transport Assessment_Pt 8_Appendix D (Part 8 of 18)
6.25 ES Volume 4 Appendix 16.1 Transport Assessment_Pt 9_Appendix E (Part 9 of 18)
6.25 ES Volume 4 Appendix 16.1 Transport Assessment_Pt 10_Appendix F (Part 10 of 18)
6.25 ES Volume 4 Appendix 16.1 Transport Assessment_Pt 11_Appendix G (Part 11 of 18)
6.25 ES Volume 4 Appendix 16.1 Transport Assessment_Pt 12_Appendix H (Part 12 of 18)
6.25 ES Volume 4 Appendix 16.1 Transport Assessment_Pt 13_Appendix I (Part 13 of 18)
6.25 ES Volume 4 Appendix 16.1 Transport Assessment_Pt 14_Appendix J (Part 14 of 18)
6.25 ES Volume 4 Appendix 16.1 Transport Assessment_Pt 17_Appendix M (Part 17 of 18)
6.25 ES Volume 4 Appendix 16.1 Transport Assessment_Pt 18 Appendix N (Part 18 of 18) (Version 2) clean
6.25 ES Volume 4 Appendix 17.1 FRA (Part 1 of 17)
6.25 ES Volume 4 Appendix 17.1 FRA App B EA data part 1 (Part 2 of 17)
6.25 ES Volume 4 Appendix 17.1 FRA App B EA data part 2 (Part 3 of 17)
6.25 ES Volume 4 Appendix 17.1 FRA App C to J (Part 4 of 17)
6.25 ES Volume 4 Appendix 17.1 FRA App K to M (Part 5 of 17)
6.25 ES Volume 4 Appendix 17.1 FRA App N part 1 (Part 6 of 17)
6.25 ES Volume 4 Appendix 17.1 FRA App N part 2 Tidal flood maps 2015 (Part 7 of 17)
6.25 ES Volume 4 Appendix 17.1 FRA App N part 3 Tidal flood maps 2075 (Part 8 of 17)
6.25 ES Volume 4 Appendix 17.1 FRA App N part 4 Tidal flood maps 2115 (Part 9 of 17)
6.25 ES Volume 4 Appendix 17.1 FRA App N part 5 Fluvial flood maps 2015 (Part 10 of 17)
6.25 ES Volume 4 Appendix 17.1 FRA App N part 6 Fluvial flood maps 2075 (Part 11 of 17)
6.25 ES Volume 4 Appendix 17.1 FRA App N part 7 Fluvial flood maps 2115 (Part 12 of 17)
6.25 ES Volume 4 Appendix 17.1 FRA App N part 8 Flood difference maps (Part 13 of 17)
6.25 ES Volume 4 Appendix 17.1 FRA App O part 1 (Part 14 of 17)
6.25 ES Volume 4 Appendix 17.1 FRA App O part 2 (Part 15 of 17)
6.25 ES Volume 4 Appendix 17.1 FRA App O part 3 (Part 16 of 17)
6.25 ES Volume 4 Appendix 17.1 FRA App P to T (Part 17 of 17)
6.25 ES Volume 4 Appendix 17.2 to 17.4 Water
6.25 ES Volume 4 Appendix Series 18 In-combination and Cumulative Effects
Part 7 – Council Resolutions
7.1 Report to The Council 25th June 2019
7.2 Minutes of the meeting 25th June 2019
Part 8 – Other Documents
8.3 Preliminary Business Case 2014, Part 1 of 3
8.3 Preliminary Business Case 2014, Part 2 of 3
8.3 Preliminary Business Case 2014, Part 3 of 3
8.4 Outline Business Case 2017, Part 1 of 3
8.4 Outline Business Case 2017, Part 2 of 3
8.4 Outline Business Case 2017, Part 3 of 3
8.5 Major Accidents and Disasters
8.6 Letter from Colin Medus, NSC Offsite planting on the A369 Portbury Hundred 12 Sept 2019
8.7 Level Crossings Risk Assessment Report Ashton Junction
8.8 Level Crossing Narrative Risk Assessment Ashton Containers Footpath Level Crossing
8.11 Planning Statement (Version 2) clean
8.15 Code of Construction Practice (Version 2) clean
Part 9 – Examination Documents
9.2 ExA.SoCG1.D0.V1 Progress Update on Statements of Common Ground (not included as superseded by SoCGs below)
9.3.2 ExA.SoCG-BCC.D7.V3 Statement of Common Ground Bristol City Council (Version 3)
9.3.3 ExA.SoCG-EA.D7.V5 Statement of Common Ground Environment Agency (Version 5)
9.3.3 ExA.SoCG-EA.D3.V2 Appendix 1 to Statement of Common Ground Environment Agency (Version 2)
9.3.3 ExA.SoCG-EA.D3.V2 Appendix 2 to Statement of Common Ground Environment Agency (Version 2)
9.3.3 ExA.SoCG-EA.D3.V2 Appendix 3 to Statement of Common Ground Environment Agency (Version 2)
9.3.3 ExA.SoCG-EA.D3.V2 Appendix 4 to Statement of Common Ground Environment Agency (Version 2)
9.3.3 ExA.SoCG-EA.D3.V2 Appendix 5 to Statement of Common Ground Environment Agency (Version 2)
9.3.3 ExA.SoCG-EA.D3.V2 Appendix 6 to Statement of Common Ground Environment Agency (Version 2)
9.3.4 ExA.SoCG-HECL.D1.V1 Statement of Common Ground Highways England (Version 1)
9.3.5 ExA.SoCG-HE.D1.V1 Statement of Common Ground Historic England (Version 1)
9.3.6 ExA.SoCG-NE.D6.V4 Statement of Common Ground Natural England (Version 4) clean
9.3.7 ExA.SoCG-NSLIDB.D7.V2 Statement of Common Ground North Somerset Levels Internal Drainage Board (Version 2)
9.3.9 ExA.SoCG-SCC.D1.V1 Statement of Common Ground Somerset County Council (Version 1)
9.3.10 ExA.SoCG-OL.D7.V3 Statement of Common Ground Openreach Limited (Version 3)
9.3.11 ExA.SoCG-ASP.D1.V1 Statement of Common Ground Avon & Somerset Constabulary (Version 1)
9.3.12 ExA.SoCG-BPC.D1.V1 Statement of Common Ground Bristol Port Company (Version 1)
9.3.13 ExA SoCG-WW.D7.V3 Statement of Common Ground Wessex Water Services Limited (Version 3)
9.3.17 ExA.SoCG-NT.D7.V1 Statement of Common Ground National Trust (Version 1)
9.3.19 ExA.SoCG-FL.D7.V2 Statement of Common Ground Freightliner Limited (Version 2)
9.4 ExA.RR.D1.V2 Comments on Relevant Representations (Version 2)
9.5 ExA.OFH.D1.V1 Response to Representations at OFH1 (Version 1)
9.6 ExA.CL.D1.V1 Cover Letter Deadline 1
9.7 ExA.SoC.D7.V5 Statement of Commonality of Statements of Common Ground (Version 5)
9.8 ExA.CL.D2.V1 Cover Letter Deadline 2
9.9.1 ExA.LIR.D2.V1 Applicant_s reponse to the Bristol City Council Local Impact Report
9.9.2 ExA.LIR.D2.V1 Applicant_s reponse to the North Somerset District Council Local Impact Report
9.9.3 ExA.LIR.D2.V1 Applicant_s reponse to the South Gloucestershire Council Local Impact Report
9.10 ExA.WQ1.D2.V1 Applicant_s responses to the Examining Authority Written Questions ExQ1
9.12.2 ExA.CWR.D2.V1 Applicant_s response to Susan Freestone representation REP1-043
9.12.3 ExA.CAS.D2.V1 Applicant_s response to David Braunton representation AS-049
9.13 ExA.AS.D2.V1 Hedgerow Location Plan (Version 1)
9.14 ExA.CL.D3.V1 Applicant’s cover letter for Deadline 3
9.15 ExA.CAH1.D3.V1 Applicant’s Oral Case and response to Representations at CAH1
9.15 ExA.CAH1.D3.V1 Appendix 1 to Applicant’s response to CAH1
9.15 ExA.CAH1.D3.V1 Appendix 2 to Applicant’s response to CAH1
9.15 ExA.CAH1.D3.V1 Appendix 3 to Applicant’s response to CAH1
9.15 ExA.CAH1.D3.V1 Appendix 4 to Applicant’s response to CAH1
9.15 ExA.CAH1.D3.V1 Appendix 5 to Applicant’s response to CAH1
9.16 ExA.ISH1.D3.V1 Applicant’s Oral Case and response to Representations at ISH1
9.16 ExA.ISH1.D3.V1 Appendix 1 to Applicant’s response to ISH1
9.17 ExA.WQ1R.D3.V1 Applicant’s comments on responses to ExQ1
9.17 ExA.WQ1R.D3.V1 Appendix AQ.1.2 to Applicant’s comments on responses to ExQ1
9.17 ExA.WQ1R.D3.V1 Appendix Series BIO.1.14 to Applicant’s comments on responses to ExQ1
9.17 ExA.WQ1R.D3.V1 Appendix FRD.1.4 to Applicant’s comments on responses to ExQ1
9.17 ExA.WQ1R.D3.V1 Appendix GC.1.12-1 to Applicant’s comments on responses to ExQ1
9.17 ExA.WQ1R.D3.V1 Appendix GC.1.12-2 to Applicant’s comments on responses to ExQ1
9.18 ExA.CWR.D3.V1 Applicant’s responses to Written Representations at Deadline 2
9.18 ExA.CWR.D3.V1 Appendix 1 to Applicant’s responses to Written Representations at Deadline 2
9.18 ExA.CWR.D3.V1 Appendix 2 to Applicant’s responses to Written Representations at Deadline 2
9.19 ExA.FI.D4.V2 Applicant_s response to ExA_s Actions from CAH1 (Version 2)
9.20 ExA.FI.D4.V2 Applicant_s response to the ExA_s Actions from ISH1 (Version 2)
9.21 ExA.FI.D3.V1 Letters of No Impediment (LONI) in respect of bat and badger licences
9.22 ExA.CL.D4.V1 Applicant_s cover letter for Deadline 4
9.23 ExA.ISH2.D4.V1 Applicant_s Oral Case and response to Representations at ISH2
9.23 ExA.ISH2.D4.V1 Appendix 1 to Applicant_s Oral Case and response to Representations at ISH2
9.23 ExA.ISH2.D4.V1 Appendix 2 to Applicant_s Oral Case and response to Representations at ISH2
9.23 ExA.ISH2.D4.V1 Appendix 3 to Applicant_s Oral Case and response to Representations at ISH2
9.23 ExA.ISH2.D4.V1 Appendix 4 to Applicant_s Oral Case and response to Representations at ISH2
9.23 ExA.ISH2.D4.V1 Appendix 5 to Applicant_s Oral Case and response to Representations at ISH2
9.23 ExA.ISH2.D4.V1 Appendix 6 to Applicant_s Oral Case and response to Representations at ISH2
9.23 ExA.ISH2.D4.V1 Appendix 7 to Applicant_s Oral Case and response to Representations at ISH2
9.24 ExA.ISH3.D4.V1 Applicant_s Oral Case and response to Representations at ISH3
9.24 ExA.ISH3.D4.V1 – Appendix 1 to Applicant_s Oral Case and response to Representations at ISH3
9.24 ExA.ISH3.D4.V1 – Appendix 2 to Applicant_s Oral Case and response to Representations at ISH3
9.25 ExA.CWR.D4.V1 Applicant_s response to Written Representations submitted for Deadline 3
9.26 ExA.FI.D4.V1 Applicant_s response to ExA_s Actions from ISH2
9.26 ExA.FI.D4.V1 Appendix 1 to Applicant_s response to ExA_s Actions from ISH2
9.27 ExA.FI.D4.V1 Applicant_s response to ExA_s Actions from ISH3
9.27 ExA.FI.D4.V1 Appendix 1 to Applicant_s response to ExA_s Actions from ISH3
9.27 ExA.FI.D4.V1 Appendix 2 to Applicant_s response to ExA_s Actions from ISH3
9.27 ExA.FI.D4.V1 Appendix 3 to Applicant_s response to ExA_s Actions from ISH3
9.28 ExA.FI.D4.V1 – Application for Non-Material Change to draft Development Consent Order
9.29 ExA.CAS.D4.V1 Applicant_s response to Additional Submission of Mr Stuart Tarr (AS-053)
9.30 ExA.CAS.D4.V1 Applicant_s response to Additional Submission of Mr Stuart Tarr (AS-058)
9.31 ExA.FI.D4.V1 List of consequential amendments arising from removal of Work 16D
9.32 ExA.CL.D5.V1 Applicant_s cover letter for Deadline 5
9.36 ExA.FI.D5.V1 Draft Heads of Terms between the Applicant and Forestry Commission (Version 1) – SUPERSEDED (see 9.47 ExA.FI.D7.V3)
9.37 ExA.CL.D6.V1 Applicant_s Cover Letter for Deadline 6
9.40 ExA.ISH4.D6.V1 Applicant_s Oral Case and response to Representations at ISH4
9.41 ExA.ISH5.D6.V1 Applicant_s Oral Case and response to Representations at ISH5 (Version 1)
9.42 ExA.CAH2.D6.V1 Applicant_s Oral Case and response to Representations at CAH2 (Version 1)
9.44 ExA.FI.D6.V1 Applicant_s response to the ExA_s actions from ISH4 (Version 1)
9.45 ExA.FI.D6.V1 Applicant_s response to the ExA_s Actions from the ISH5 (Version 1)
9.46 ExA.FI.D6.V2 Applicant_s response to ExA_s Actions from CAH2 (Version 2)
9.47 ExA.FI.D7.V3 Completed Agreement with Forestry Commission executed by Forestry Commission (Version 3)
9.47 ExA.FI.D7.V3 Completed Agreement with Forestry Commission executed by the Applicant (Version 3)
9.48 ExA.FI.D6.V1 Fencing Grades Summary (Version 1)
9.51 ExA.CC.D7.V2 Crown Land Schedule of Negotiations (Version 2)
9.52 ExA.FI.D6.V1 Dimensions from Railway (Trinity Footbridge to the Adjacent Houses)
9.53 ExA.FI.D6.V1 Typical Sections Trinity Footbridge
9.54 ExA.FI.D6.V1 Shadow Study Trinity Footbridge
9.55 ExA.FI.D6.V1 Additional Photomontages – Trinity Footbridge (Version 1)
9.56 ExA.CL.D6.V1 Applicant_s Cover Letter for Additional Deadline 6 Submissions
9.57 ExA.CAS.D6.V1 Applicant_s response to Additional Submission of Andrea Gordon (AS-067)
9.58 ExA.CL.D7.V1 Applicant_s Cover Letter for Deadline 7
9.59 ExA.CWR.D7.V1 Applicant_s response to Written Representations submitted for Deadline 6
9.60 ExA.FI.D7.V1 Applicant_s comments on the preferred draft Order proposed by the ExA
9.64 ExA.FI.D7.V1 Section 127 Position Statement (Version 1)
9.66 ExA.FI.D7.V1 Responses to further information previously requested for Deadline 7
9.67 ExA.FI.D7.V1 Section 135 Crown consent from Ministry of Defence (Version 1)
9.68 ExA.CL.D7.V1 Applicant_s Cover Letter for Examination Closing Submissions
9.71 ExA.FI.D7.V1 Consents and Licences required under Other Legislation (including progress update)
9.72 ExA.CWR.D7.V1 Applicant_s response to Written Representations submitted for Deadline 7
9.74 ExA.FI.D7.V1 Section 135 Crown consent from Defra and Forestry Commission
9.75 ExA.FI.D7.V1 Section 135 Crown consent from Department for Transport
9.76 ExA.FI.D7.V1 DCO Validation Reports – Parts 1 to 3
Part 10 – Secretary of State’s Decision